Difference between revisions of "Ringways References"

From ArchiveWiki
Jump to navigationJump to search
 
(149 intermediate revisions by 2 users not shown)
Line 2: Line 2:
This is an experiment into how references might be collated and published for the Ringways articles. The references will not be placed on the pages themselves, to avoid it becoming too academic and even less readable, but instead will be collated here, with each key point in the text married up with its source.
This is an experiment into how references might be collated and published for the Ringways articles. The references will not be placed on the pages themselves, to avoid it becoming too academic and even less readable, but instead will be collated here, with each key point in the text married up with its source.


Wish me luck!
----
 
==[http://www.cbrd.co.uk/histories/ringways/background/ Background]==
==[http://www.cbrd.co.uk/histories/ringways/ringway1/ Ringway 1]==


===[http://www.cbrd.co.uk/histories/ringways/ringway1/north.shtml North Cross Route]===
===[http://www.cbrd.co.uk/histories/ringways/background/earlyplans.shtml Early plans]===


{{Col-begin}}
{{Col-begin}}
{{Col-2}}
{{Col-2}}
;Route, Willesden Junction - Hackney Wick
:[[T 319/1842]] contains the standard GLC route map for Ringway 1
;Route published in 1966
:[[MT 106/437]] for engineering plans, route study and publicity


;Demolition of Sigmund Freud's house
;New Road opened ca. 1756
 
;Royal Commission on London Traffic
;Link roads from Willesden to Harlesden, M40 and M4
:[[SJ 16]]
:[[MT 106/437]]


;Rees Jeffreys' ring road proposal
:[[SJ 16]] has outline only
{{Col-2}}
{{Col-2}}
;British Rail's objection to motorway over Camden Goods Yard


;PNLR terminus on Ringway 1
;Traffic Board for London
:[[MT 106/437]] in plan sheets
:[[SJ 16]]


;M11 to Angel link alternative route on line of A10
;Arterial Routes built by 1930s
:[[MT 106/437]] in study on alternative links to York Way and Hackney Wick


;Barbara Castle newspaper controversy
;Highway Development Survey 1937
:[[MT 106/437]]
:[[SJ 16]] has outline
{{Col-end}}
{{Col-end}}


----
----
===[http://www.cbrd.co.uk/histories/ringways/ringway1/east.shtml East Cross Route]===
 
===[http://www.cbrd.co.uk/histories/ringways/background/wartimeplans.shtml Wartime plans]===


{{Col-begin}}
{{Col-begin}}
{{Col-2}}
{{Col-2}}
;Route, Hackney Wick to Kidbrooke
:Road is as-built before 1973
:[[T 319/1842]] contains the standard GLC route map for Ringway 1
;Existing proposal by London County Council
:GLC/TD/C/P/01 held at [[London Metropolitan Archives]]


;Sections of road previously under motorway restrictions
;The County of London Plan, 1943
 
:See [[County of London Plan (1943)]]
;Sections of East Cross Route designated A106
:OS Landranger map (details to follow)


{{Col-2}}
{{Col-2}}
;A13 interchange as temporary measure
;Third Blackwall Tunnel bore planned
:A-Z map (details to follow)


;Kidbrooke Interchange (A2/A20/Ringway 1)
;The Greater London Plan, 1944
:[[HLG 159/1257]]
:See [[Greater London Plan (1944)]]
{{Col-end}}
{{Col-end}}


----
----
===[http://www.cbrd.co.uk/histories/ringways/ringway1/south.shtml South Cross Route]===
 
===[http://www.cbrd.co.uk/histories/ringways/background/postwar.shtml Post-war and beyond]===


{{Col-begin}}
{{Col-begin}}
{{Col-2}}
{{Col-2}}
;Route, Kidbrooke - Clapham Junction
:[[T 319/1842]] contains the standard GLC route map for Ringway 1


;Kidbrooke Interchange (A2/A20/Ringway 1)
;Proposal to reverse roles of A and B rings
:[[HLG 159/1257]]
:[[MT 95/86]] discusses little else


;Blackheath tunnel and alternative line proposals
;Land for road construction not protected
:[[HLG 159/1257]] for proposals made by LB Greenwich and Buchanan
:[[MT 106/299]] for report in ''South London Press'', 09/04/1971, including trial bore holes made by GLC


;New Cross Spur interchange
;M1 to terminate near Marble Arch
:[[MT 112/67]] & [[SJ 15]]


;Split carriageways at Denmark Hill
;Motorway Box replaces A- and B-rings
 
{{Col-2}}
;Brixton section, and redevelopment of Brixton
:[[LBL/BDD/1/16/1]], [[LBL/BDD/1/16/2]] and [[LBL/BDD/2/4]] for various incarnations of the Brixton Town Centre Redevelopment Plan within the Ringway timeframe


;Barrier Block (Southwyck House), Brixton
;Eastern side was pre-existing road proposal
:[http://www.urban75.org/brixton/features/barrier.html Urban 75] have a well-researched report from original files at Lambeth Archives, verified by the site's authors


;Engineer's Reports
;LCC plans and omission of Motorway Box
:[[MT 106/299]] for details on commissioning and funding
{{Col-end}}


----
;West Cross Route planning status in 1962
===[http://www.cbrd.co.uk/histories/ringways/ringway1/west.shtml West Cross Route]===
:[[West Cross Route: Interim Report on Stage I (1962)]] - document is dated April 1962


{{Col-begin}}
{{Col-2}}
{{Col-2}}
;Route, Clapham Junction - Holland Park
;GLC purpose included planning of road network
:[[MT 106/188]]
:[[CM 08]]
 
;Route, Holland Park - Westway
:This road is as-built before 1973.
:[[T 319/1842]] confirms the whole route.
 
;Route, Westway - Willesden Junction
:[[MT 106/437]]
 
;Elevated motorway with three or four lanes


;Interchange at Chelsea, and alternative plans
;Consultants brought in to assist GLC with planning
:[[MT 106/188]] for complex looped interchange
:Letter from GLC to MoT (London Highways Division), 3 September 1968, held at [[MT 106/299]]
:''Check - not sure?'' for east-facing directional interchange


{{Col-2}}
;GLC unhappy with use of Abercrombie terminology
;Designs for A4 interchange
:[[MT 106/188]] for stacked roundabout
:''Check - not sure?'' for west-facing directional interchange


;Dual carriageway proposal forking to two bridges
;GLC's overall plan and timescale
:[[HLG 159/572]] has full timescale, and costs the scheme at £1.7bn


;Western Environmental Improvement Route
;Evening Standard report with incorrect cost and rehousing numbers
:West London Assessment Study, Stage II. Viewed at Richmond Archives. Detailed page to follow.
:''Evening Standard'' 26/05/66, "That motorway box 'could cost £3000m'"


;Mention of proposal to link Chelsea and Victoria Embankments
;Camden suggesting higher capacity on North Cross Route
:[[LA 02]] mentions this plan - detailed diagrams and documents yet to be located
{{Col-end}}
{{Col-end}}


----
----
===[http://www.cbrd.co.uk/histories/ringways/ringway1/camden.shtml Camden Town Bypass]===
 
===[http://www.cbrd.co.uk/histories/ringways/background/epilogue.shtml Epilogue]===


{{Col-begin}}
{{Col-begin}}
{{Col-2}}
{{Col-2}}
;Route, Camden Road - Euston Road
:[[MT 106/437]] includes full engineering diagrams
:[[HLG 159/2457]]
{{Col-2}}
;Oval Road cantilever over bypass
:[[MT 106/437]] for written description of the route
;Artist's impression
:[[MT 106/437]] for GLC publicity on 'new roads in N and E London'
{{Col-end}}
----
===[http://www.cbrd.co.uk/histories/ringways/ringway1/balham.shtml Balham Loop]===


{{Col-begin}}
;Correspondence between Ministry and GLC
{{Col-2}}
:[[T 319/1842]] has memos in 1969 asking about "killing the whole project"
;Route, Clapham - Brixton via Tulse Hill
:[[T 319/1842]] has the standard GLC map of Ringway 1, including the Balham Loop


;Publication of route in 1966
;Estimate of cost at 1970
:''Check this'' - sure there is a written summary of whole of R1 including BL, probably dated
:[[T 319/1842]] has the GLC estimating £1,700m


;Withdrawal of route in 1967
;GLDP as biggest inquiry in British history
:Report in ''Wandsworth Boro' News'', 21/01/1967


{{Col-2}}
;Protest groups set up in South West London
;Map with Balham Loop crossed out
:''The Borough News'' 16/10/70; p. 16 "Putney Motorway Action Group formed"
:Further items to be added to this list.


;Quote from Southern Railway poster
;Grove Park Group's analysis and report


{{Col-end}}
;Coalition of South London councils
:''Clapham Observer'' 11/02/72; "Councils combine to fight M-way 'madness'"


----
;Barnes Motorway Action Group newspaper spread
==[http://www.cbrd.co.uk/histories/ringways/ringway2/ Ringway 2]==
:''Putney and Roehampton Herald'' 02/07/70 (held at [[Wandsworth Local History Service]])


{{Col-begin}}
;Layfield Report decision on Ringway 1
{{Col-2}}
:[[HLG 159/626]] has the full decision on transport
;Objector arguing that R2 would only encourage cars


{{Col-2}}
{{Col-2}}
;Objector from Strand-on-the-Green association
;DoE memo to Treasury recommending Layfield's proposals
:[[T 319/2655]]


{{Col-end}}
;Government policy on Motorway Box
:[[T 319/2655]]


===[http://www.cbrd.co.uk/histories/ringways/ringway2/north.shtml North Circular Road]===
;Leaks in Sunday Times and Private Eye
:[[T 319/2655]] has details - specific editions are:
::''Sunday Times'' 11/02/1973; "The Motor Car Wins its Biggest Victory"
::''Sunday Times'' 18/02/1973; "Full Cabinet approves London's Motorway Box"
::''Private Eye'' 23/02/1973


{{Col-begin}}
;Treasury memo puts Ringway 1 "out of the question"
{{Col-2}}
:[[T 319/2655]] includes memo dated 20/02/1973 from Diana Seammen to Mr Howard, stating "the Inner Motorway Box will never be implemented"


;Route, Hanger Lane - Woodford
;MoT merges R3 and R4 to form M25
:This road was pre-existing
:[[HLG 159/1024]] indicates that the existing North Circular was to be upgraded


;North Circular as Trunk Route
;GLC cancels R2 plans in favour of M25
:[[MT 106/151]] indicates that, in 1961, the North Circular was the responsibility of the MoT


{{Col-2}}
;A102(M), A40(M), M41 open to traffic by 1973
;Ministry of Transport proposals, 1961
:[[MT 106/151]] for the report itself
:[[MT 106/152]] for accompanying plans and diagrams


;Motorways within Greater London downgraded
{{Col-end}}
{{Col-end}}


----
----


===[http://www.cbrd.co.uk/histories/ringways/ringway2/east.shtml Eastern Section]===
==[http://www.cbrd.co.uk/histories/ringways/ringway1/ Ringway 1]==


----
See [[:Category:Ringway 1]].
===[http://www.cbrd.co.uk/histories/ringways/ringway2/south.shtml Southern Section]===


----
==[http://www.cbrd.co.uk/histories/ringways/ringway2/ Ringway 2]==
===[http://www.cbrd.co.uk/histories/ringways/ringway2/west.shtml Western Link]===


----
See [[:Category:Ringway 2]].


==[http://www.cbrd.co.uk/histories/ringways/ringway3/ Ringway 3]==
==[http://www.cbrd.co.uk/histories/ringways/ringway3/ Ringway 3]==


===[http://www.cbrd.co.uk/histories/ringways/ringway3/west.shtml Western Section]===
See [[:Category:Ringway 3]].


{{Col-begin}}
==[http://www.cbrd.co.uk/histories/ringways/ringway4/ Ringway 4]==
{{Col-2}}
 
;Route, Thames - M3
See [[:Category:Ringway 4]].
;Route, M3 - M4 - Yeading
;Route, options at Yeading
;Route, MoT option Yeading - South Oxhey
:Check (same as GLC route)


;Route, GLC option Yeading - South Oxhey
==[http://www.cbrd.co.uk/histories/ringways/northern/ Northern Radials]==
:Check (same as MoT route)
:[[MT 106/291]] for 1964 route through Stanmore and Harrow to M1 junction 3


{{Col-2}}
See [[:Category:Radials North]].
;R3 connecting to M3 junction 1
;R3 connecting to M3 at new junction at Upper Halliford (inc. reserved land and property dispute)
:[[MT 120/169]]


;Cost comparison of Ministry and GLC route options
==[http://www.cbrd.co.uk/histories/ringways/western/ Western Radials]==
:[[HLG 159/321]]


;Previous plans for D-Ring and to link M1 and Heathrow by dual carriageway
See [[:Category:Radials West]].
;Memo indicating urban or rural motorway standard
:[[MT 106/413]]


;File suggesting route number M16
==[http://www.cbrd.co.uk/histories/ringways/southern/ Southern Radials]==


{{Col-end}}
See [[:Category:Radials South]].

Latest revision as of 19:19, 10 March 2011

This is an experiment into how references might be collated and published for the Ringways articles. The references will not be placed on the pages themselves, to avoid it becoming too academic and even less readable, but instead will be collated here, with each key point in the text married up with its source.


Background

Early plans

New Road opened ca. 1756
Royal Commission on London Traffic
SJ 16
Rees Jeffreys' ring road proposal
SJ 16 has outline only

Traffic Board for London
SJ 16
Arterial Routes built by 1930s
Highway Development Survey 1937
SJ 16 has outline


Wartime plans

The County of London Plan, 1943
See County of London Plan (1943)

The Greater London Plan, 1944
See Greater London Plan (1944)


Post-war and beyond

Proposal to reverse roles of A and B rings
MT 95/86 discusses little else
Land for road construction not protected
M1 to terminate near Marble Arch
MT 112/67 & SJ 15
Motorway Box replaces A- and B-rings
Eastern side was pre-existing road proposal
LCC plans and omission of Motorway Box
West Cross Route planning status in 1962
West Cross Route: Interim Report on Stage I (1962) - document is dated April 1962

GLC purpose included planning of road network
Consultants brought in to assist GLC with planning
Letter from GLC to MoT (London Highways Division), 3 September 1968, held at MT 106/299
GLC unhappy with use of Abercrombie terminology
GLC's overall plan and timescale
HLG 159/572 has full timescale, and costs the scheme at £1.7bn
Evening Standard report with incorrect cost and rehousing numbers
Evening Standard 26/05/66, "That motorway box 'could cost £3000m'"
Camden suggesting higher capacity on North Cross Route


Epilogue

Correspondence between Ministry and GLC
T 319/1842 has memos in 1969 asking about "killing the whole project"
Estimate of cost at 1970
T 319/1842 has the GLC estimating £1,700m
GLDP as biggest inquiry in British history
Protest groups set up in South West London
The Borough News 16/10/70; p. 16 "Putney Motorway Action Group formed"
Further items to be added to this list.
Grove Park Group's analysis and report
Coalition of South London councils
Clapham Observer 11/02/72; "Councils combine to fight M-way 'madness'"
Barnes Motorway Action Group newspaper spread
Putney and Roehampton Herald 02/07/70 (held at Wandsworth Local History Service)
Layfield Report decision on Ringway 1
HLG 159/626 has the full decision on transport

DoE memo to Treasury recommending Layfield's proposals
T 319/2655
Government policy on Motorway Box
T 319/2655
Leaks in Sunday Times and Private Eye
T 319/2655 has details - specific editions are:
Sunday Times 11/02/1973; "The Motor Car Wins its Biggest Victory"
Sunday Times 18/02/1973; "Full Cabinet approves London's Motorway Box"
Private Eye 23/02/1973
Treasury memo puts Ringway 1 "out of the question"
T 319/2655 includes memo dated 20/02/1973 from Diana Seammen to Mr Howard, stating "the Inner Motorway Box will never be implemented"
MoT merges R3 and R4 to form M25
GLC cancels R2 plans in favour of M25
A102(M), A40(M), M41 open to traffic by 1973
Motorways within Greater London downgraded


Ringway 1

See Category:Ringway 1.

Ringway 2

See Category:Ringway 2.

Ringway 3

See Category:Ringway 3.

Ringway 4

See Category:Ringway 4.

Northern Radials

See Category:Radials North.

Western Radials

See Category:Radials West.

Southern Radials

See Category:Radials South.