Difference between revisions of "The London - Birmingham Motorway: Traffic and Economics (1960)"

From ArchiveWiki
(Created page with "Category:Publications {{Artefact | date = 1960 | owner1 = Steven | type = Publications }} ==Context== Despite being published in 1960 after the opening of the M1, thi...")
 
 
Line 8: Line 8:
 
==Context==
 
==Context==
 
Despite being published in 1960 after the opening of the M1, this report from the Road Research Laboratory was mostly concerned with gathering information before opening, with work starting in 1955; including lots of information regarding traffic flow estimates.
 
Despite being published in 1960 after the opening of the M1, this report from the Road Research Laboratory was mostly concerned with gathering information before opening, with work starting in 1955; including lots of information regarding traffic flow estimates.
 +
 +
I would probably describe this as "interesting rather than exciting".
  
 
==Contents of Note==
 
==Contents of Note==
 
Lots of tables and diagrams and huge amounts of wordiness.
 
Lots of tables and diagrams and huge amounts of wordiness.

Latest revision as of 15:38, 9 February 2020

Date1960
Owned bySteven
TypePublications (see all artefacts)

Context

Despite being published in 1960 after the opening of the M1, this report from the Road Research Laboratory was mostly concerned with gathering information before opening, with work starting in 1955; including lots of information regarding traffic flow estimates.

I would probably describe this as "interesting rather than exciting".

Contents of Note

Lots of tables and diagrams and huge amounts of wordiness.