RAIL 475/250

From ArchiveWiki
Revision as of 21:33, 28 December 2008 by Chris5156 (talk | contribs) (New page: Category:Subseries RAIL 475 {| |'''Location''' |National Archives |- |'''Title''' |Operation of tramways and buses through vehicular tunnel: extracts for proceedings before parliam...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search
Location National Archives
Title Operation of tramways and buses through vehicular tunnel: extracts for proceedings before parliamentary committees in 1925
Date range 1925-1927
Catalogue See entry

Context

At the time the Mersey Tunnel was planned, a lower deck for tram lines was proposed and this was included in the design. It had already, theoretically, been ruled out by the time construction work started, but was retained to avoid having to re-design the tunnel.

This file documents the relentless arguing about the tramway. The short form of the story appears that Liverpool (as the main sponsor of the tunnel) wanted trams in it; the Mersey Railway Company and Birkenhead were opposed; and Liverpool didn't want it badly enough to force the issue.

It was also decided at the time not to run public buses through the tunnel, though they do run through it today.

Links to other files

MT 39/123 TUNNELS: Mersey Tunnel (1923-1928)

People with camera copies

Chris Marshall has a partial copy.