Chris's LMA hit list: Difference between revisions

From ArchiveWiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 8: Line 8:
:RINGWAY 1 (BLACKWALL TUNNEL SOTHERN APPROACH) TRAFFIC SIGNS SURVEY (NOT CORRECT)
:RINGWAY 1 (BLACKWALL TUNNEL SOTHERN APPROACH) TRAFFIC SIGNS SURVEY (NOT CORRECT)
:''Why not correct? What was the survey - deciding a sign strategy or reviewing existing stock? Undated.''
:''Why not correct? What was the survey - deciding a sign strategy or reviewing existing stock? Undated.''
;ACC/3499/EH/08/04/019
:Ringway 1
:1968-1970
;ACC/3499/EH/08/04/020
:Ringway 2
:1967-1972


;GLC/DG/AE/ROL/02/188
;GLC/DG/AE/ROL/02/188
Line 24: Line 16:
:Ringway 2: Richmond upon Thames, second interim report
:Ringway 2: Richmond upon Thames, second interim report
:1971
:1971
;GLC/DG/AR/06/093
:Ringway 2
:1966-1972


;GLC/DG/AR/06/094
;GLC/DG/AR/06/094
Line 41: Line 29:


==Keyword: SOUTH CROSS ROUTE==
==Keyword: SOUTH CROSS ROUTE==
;GLC/DG/PTI/P/05/069
:South Cross Route
:1965-1969


;LCC/PP/HT/001
;LCC/PP/HT/001
:Proposed South Cross route and North Cross route
:Proposed South Cross route and North Cross route
:19 Mar 1965
:19 Mar 1965
:''This one wasn't found in the stacks when I requested it - will try again later.''
==Manual searches of the catalogue==
;GLC/DG/PTI/P/05/075
:Wandsworth Bridge Southern Approach
;GLC/DG/PTI/P/05/084
:Woolwich River Crossing (Thamesmead)
;GLC/DG/PTI/P/05-2
:Kingston Road - Tibbett's Corner, Roehampton Lane and Roehampton Vale
;GLC/DG/PTI/P/05/005
:Expanded programme - major road improvements
;GLC/DG/PTI/P/05/009
:Metropolitan roads
;GLC/TD/PM/CDO/07/258
:M41 access proposals for adjoining routes
:1980
===Series to investigate which are not yet in the catalogue===
*GLC/TD/LIB/01
*GLC/TD/LIB/05
*GLC/TD/LIB/06
*GLC/TD/LIB/07
All of the above are various publications of the GLC Transportation and Development Department

Revision as of 17:30, 29 January 2010

Here's some stuff I would like from LMA, found while rummaging in a carefree manner through their online catalogue. The LMA's online catalogue is a masterclass in web design without reference to usability. Good luck in there, and take supplies.

Keyword: RINGWAY

There are other files that come up under this search - countless with the generic title "Ringway 2" or "Ringway 3". They could take days just to retrieve from the stack to see what's in them. I have tried to concentrate on files that have titles useful enough to indicate there's something of interest in them.

GLC/TD/PM/CDO/05-13834
RINGWAY 1 (BLACKWALL TUNNEL SOTHERN APPROACH) TRAFFIC SIGNS SURVEY (NOT CORRECT)
Why not correct? What was the survey - deciding a sign strategy or reviewing existing stock? Undated.
GLC/DG/AE/ROL/02/188
Ringway 2: Richmond upon Thames, first interim report
1970
GLC/DG/AE/ROL/02/189
Ringway 2: Richmond upon Thames, second interim report
1971
GLC/DG/AR/06/094
Ringway 3 (for Dover Radial Route see DG/AR/6/136)
1965-1976
GLC/RA/D2G/03/081
Ringway 2: C Ring Road: Thamesmead to Falconwood
1968-1970
SC/PHL/02/0723-33
Ringway 2: Ringway 2 study Thamesmead to Falcon Wood, Plumstead Common Area

Keyword: SOUTH CROSS ROUTE

LCC/PP/HT/001
Proposed South Cross route and North Cross route
19 Mar 1965
This one wasn't found in the stacks when I requested it - will try again later.

Manual searches of the catalogue

GLC/DG/PTI/P/05/075
Wandsworth Bridge Southern Approach
GLC/DG/PTI/P/05/084
Woolwich River Crossing (Thamesmead)
GLC/DG/PTI/P/05-2
Kingston Road - Tibbett's Corner, Roehampton Lane and Roehampton Vale
GLC/DG/PTI/P/05/005
Expanded programme - major road improvements
GLC/DG/PTI/P/05/009
Metropolitan roads
GLC/TD/PM/CDO/07/258
M41 access proposals for adjoining routes
1980

Series to investigate which are not yet in the catalogue

  • GLC/TD/LIB/01
  • GLC/TD/LIB/05
  • GLC/TD/LIB/06
  • GLC/TD/LIB/07

All of the above are various publications of the GLC Transportation and Development Department