Ringways References: Difference between revisions

From ArchiveWiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 9: Line 9:


;Route, A2 - Clapham Junction
;Route, A2 - Clapham Junction
:[[MT 106/299]] is among the files containing the standard GLC route map for Ringway 1


;Kidbrooke Interchange (A2/A20/Ringway 1)
;Kidbrooke Interchange (A2/A20/Ringway 1)
:[[HLG 159/1257]]


;Blackheath tunnel and alternative line proposals
;Blackheath tunnel and alternative line proposals
:[[HLG 159/1257]] for proposals made by LB Greenwich
:[[MT 106/299]] for Buchanan's tunnel proposals
:''South London Press'', 09/04/1971, for trial bore holes made by GLC


;New Cross Spur interchange
;New Cross Spur interchange
Line 19: Line 24:


;Brixton section, and redevelopment of Brixton
;Brixton section, and redevelopment of Brixton
:[[LBL/BDD/1/16/1]], [[LBL/BDD/1/16/2]] and [[LBL/BDD/2/4]] for various incarnations of the Brixton Town Centre Redevelopment Plan within the Ringway timeframe


;Barrier Block (Southwyck House), Brixton
;Barrier Block (Southwyck House), Brixton
:[http://www.urban75.org/brixton/features/barrier.html Urban 75] have a well-researched report from original files at Lambeth Archives, verified by the site's authors


;Engineer's Reports
;Engineer's Reports
:[[MT 106/299]] for details on commissioning and funding


==[http://www.cbrd.co.uk/histories/ringways/ringway3/ Ringway 3]==
==[http://www.cbrd.co.uk/histories/ringways/ringway3/ Ringway 3]==

Revision as of 23:01, 30 November 2009

This is an experiment into how references might be collated and published for the Ringways articles. The references will not be placed on the pages themselves, to avoid it becoming too academic and even less readable, but instead will be collated here, with each key point in the text married up with its source.

Wish me luck!

Ringway 1

South Cross Route

Route, A2 - Clapham Junction
MT 106/299 is among the files containing the standard GLC route map for Ringway 1
Kidbrooke Interchange (A2/A20/Ringway 1)
HLG 159/1257
Blackheath tunnel and alternative line proposals
HLG 159/1257 for proposals made by LB Greenwich
MT 106/299 for Buchanan's tunnel proposals
South London Press, 09/04/1971, for trial bore holes made by GLC
New Cross Spur interchange
Split carriageways at Denmark Hill
Brixton section, and redevelopment of Brixton
LBL/BDD/1/16/1, LBL/BDD/1/16/2 and LBL/BDD/2/4 for various incarnations of the Brixton Town Centre Redevelopment Plan within the Ringway timeframe
Barrier Block (Southwyck House), Brixton
Urban 75 have a well-researched report from original files at Lambeth Archives, verified by the site's authors
Engineer's Reports
MT 106/299 for details on commissioning and funding

Ringway 3

Western Section

Route, Thames - M3
Route, M3 - M4 - Yeading
Route, options at Yeading
Route, MoT option Yeading - South Oxhey
Check (same as GLC route)
Route, GLC option Yeading - South Oxhey
Check (same as MoT route)
MT 106/291 for 1964 route through Stanmore and Harrow to M1 junction 3
R3 connecting to M3 junction 1
R3 connecting to M3 at new junction at Upper Halliford (inc. reserved land and property dispute)
MT 120/169
Cost comparison of Ministry and GLC route options
HLG 159/321
Previous plans for D-Ring and to link M1 and Heathrow by dual carriageway
Memo indicating urban or rural motorway standard
MT 106/413
File suggesting route number M16